As on December 31, 2023, the progress of Power House Complex (Surge Shaft, Butterfly Valve Chamber, Pressure Shaft, Power House, Transformer Hall, and Tail Race Tunnel) is at 98.95%.
Power House Complex | ||
---|---|---|
Work fronts | Progress as of December 31, 2023 | |
Surge Shaft and BVC |
|
|
Pressure Shaft |
|
|
Power House |
|
|
Control Block |
|
|
Transformer Cavern |
|
|
TRT and Gate Shaft Concreting |
|
|